Norske Skog Albury Mill Automation Upgrade (Closeout)

2005 - 2006   Control Systems Project Management Pulp and Paper

Albury, Australia

  200x     Australia     Boilers     Commissioning     Control Systems     DCS     Design Management     Engineering Design     Industrial Control Systems     Installation Supervision     Metso DNA Valmet XD     Norske Skog     Paper & Board Machines     Project Management     Pulp and Paper  

Overview

Project Manager for Automation Project closeout.

Role

Project Manager

Descripton

Norske Skog engaged MIPAC to upgrade the existing control systems site wide from a number of legacy platforms to the Metso DNA DCS.

My role was Project Manager for the closeout phase of the project.

Included closeout items from the following process areas,

  • TMP
  • Boiler safety PLC upgrade
  • Paper machine
Challanges

This project included several challenges, including,

  • The closeout phase of the project (all outstanding defects and variations) was quoted on a lump sum basis
  • Completing this work in parallel with other project works on the same site